The project is operated in the PPP mode. The total design scale is 800 tons of garbage per day, 400 tons per day for the first phase. After the project is completed, the annual domestic garbage can reach 292000 tons, the annual power generation is about 114 million kWh, 46000 tons of standard coal can be saved, and 113700 tons of carbon dioxide can be reduced.
The project will turn waste into treasure through incineration power generation, generate economic, social and ecological benefits, and help promote the development of circular economy and the construction of the "Great Beauty Juye".